Every data centre has a runtime figure. The refuelling plan is what keeps the generators going past it.

  • Fuel Supply
  • Tanker Access
  • Fill Points
  • Alerts

A data centre's diesel reserve covers its generators for a set number of hours. If an outage lasts longer, the site depends on refuelling. Plan it before it is needed: put supply agreements in place, ideally with more than one supplier and with priority delivery terms. Set reorder points in hours of runtime remaining, not litres, and allow for the supplier's delivery time during a wider emergency. Make sure tankers can reach the fill point at any hour, with room to stand and turn, and that the fill point has spill containment and overfill protection. Monitor tank levels remotely with alerts that reach the people who order fuel. Then test the plan, including a delivery while the generators are running.

Most data centre fuel planning stops at the reserve: how many hours of storage the generators need. That figure matters, and A-FLO's guide to diesel storage for backup generators covers how to work it out. But a reserve is finite. In an outage that runs past it, uptime depends on fuel arriving and getting into the tanks.

This guide covers the refuelling side of data centre fuel planning: supply, access, fill points and monitoring. It forms part of A-FLO's data centre fuel and power solutions.

Hours The unit to set reorder points in, not litres
SMS + email FLUIDBOT alerts on customisable level thresholds
24/7 Tanker access a data centre fill point needs

The Reserve Buys Time

Runtime from storage depends on how much fuel is in the tanks and how fast the generators burn it at the load they are carrying. In a real outage, the tanks may not be full and the load may differ from the design figure. That is why the refuelling plan starts from what is actually in the tanks.

Think in hours, not litres

A reorder point of a set number of litres means little during an outage. A reorder point of a set number of hours of runtime remaining, worked out from current consumption, tells the team how long they have to get fuel on site.

Securing the Fuel Supply

  • Supply agreements in advance. Agree delivery terms for emergencies before one happens, including how quickly a delivery can arrive.
  • More than one supplier. A wide outage affects suppliers, roads and other customers too. A second source reduces the risk of one supplier being unable to deliver.
  • Know the delivery size. The tanks need room for a full delivery when it arrives.
  • Allow for the delay. Set the reorder point so the order is placed with enough runtime left to cover the supplier's delivery time, plus a margin.
  • Agree the fuel specification. Make sure emergency deliveries meet the same specification as normal supply.

Tanker Access and Fill Points

A delivery that cannot get to the fill point does not help. The site layout has to work for a tanker, at any hour, possibly with no power to gates and lighting.

Point What to check
Route A clear path from the street to the fill point, with gates and barriers that open during a power outage
Standing area Room for the tanker to stand and turn safely, away from traffic and building entries
Fill point Located for easy hose connection, clearly labelled, secured against unauthorised use
Spill containment Containment at the fill point and a spill kit on hand
Overfill protection High-level alarms and protection so a delivery cannot overfill the tank
Level visibility Tank levels visible at the fill point, so the driver and site team know how much the tank can take

Tank siting, fill point location and spill containment also need to meet AS 1940, the project's fire engineering and the local authority's requirements. A-FLO's data centre solutions consider site footprint, refuelling access and storage design together.

Monitoring That Triggers the Order

During an outage, the team is busy. The fuel order should be prompted by the system, not by someone remembering to check.

Remote alerts

FLUIDBOT

FLUIDBOT takes up to 96 level readings a day and sends SMS and email alerts on customisable thresholds, over cellular or satellite connectivity.

Gauging

Automatic tank gauging

LEVELTRACK and FLUIDLEV gauges report levels continuously, with options for mains, solar or battery power.

People

Alerts to the right people

Send alerts to whoever places fuel orders, with a backup contact, not only to a control panel.

Set more than one alert level: an early warning to check supply, a reorder alert, and a critical alert. Make sure the monitoring itself runs on backed-up power and does not depend on a network that the outage takes down.

Testing the Refuelling Plan

Write it down

Suppliers and contacts, reorder points in hours, who orders, how the tanker gets in, and who meets it.

Check access in an outage

Confirm gates, lighting and security systems let a tanker in when mains power is off.

Test a delivery under load

Take a delivery while the generators are running, to prove the fill point, alarms and procedures work together.

Test the alerts

Trigger each alert level and check that the right people receive it.

Review after every event

After any long generator run, check how long fuel took to arrive and adjust the reorder points.

Refuelling only helps if the fuel and the system that moves it are in good condition. See keeping standby diesel ready and bulk tanks and day tanks for data centre generators. A-FLO's service and maintenance team covers tanks, transfer equipment and monitoring.

What Goes Wrong

  • No supply agreement. The site joins the queue with every other customer in the outage.
  • Reorder points in litres. The order goes in too late for the delivery time.
  • Gates that need mains power. The tanker arrives and cannot get in.
  • No room in the tank. The delivery is larger than the space available.
  • Alerts to an empty room. Nobody who can order fuel receives them.
  • A plan never tested. The first delivery under load is during a real outage.

Frequently Asked Questions

How do data centres refuel generators during a long power outage?

With a plan set up in advance: supply agreements with priority delivery, reorder points in hours of runtime, tanker access that works without mains power, a fill point with containment and overfill protection, and remote level alerts sent to the people who order fuel.

How much diesel storage does a data centre need?

It depends on generator consumption, load, the required backup runtime, redundancy and how quickly fuel can be resupplied. A-FLO can help select tank capacities based on the project's requirements.

When should a data centre reorder diesel during an outage?

When the runtime remaining, worked out from current consumption, falls to the supplier's delivery time plus a safety margin. Setting reorder points in hours rather than litres makes this clear.

Can a data centre refuel while the generators are running?

Refuelling during an outage usually means filling bulk tanks while generators draw from them, so the fill point, overfill protection, alarms and procedures should be designed and tested for it.

How can a data centre monitor diesel levels remotely?

With automatic tank gauging and remote monitoring. A-FLO's FLUIDBOT takes up to 96 readings a day and sends SMS and email alerts on customisable thresholds, and LEVELTRACK and FLUIDLEV gauges report levels continuously.

What does a data centre fuel fill point need?

Clear tanker access and standing room, a secure and labelled connection, spill containment, overfill protection, and visible tank levels so the driver and site team know how much the tank can take.