Bulk Tanks and Day Tanks for Data Centre Generators: Designing the Fuel Transfer System
A generator only runs as long as fuel reaches it. Between the bulk tank and the engine sits a transfer system that has to work the first time, every time.
- Bulk Storage
- Day Tanks
- Transfer Pumps
- Controls
Most data centre generator fuel systems have two levels of storage. Bulk tanks hold the main reserve, sized for the required backup runtime. Each generator then draws from a smaller day tank close to the engine. A transfer system moves diesel from bulk to day tank automatically: level controls start a transfer pump when the day tank falls to a set level and stop it when it is full, with high and low level alarms. Transfer pumps are usually arranged as duty and standby, so one can fail without stopping supply. The system also needs filtration, isolation valves for maintenance, overfill protection, and monitoring that reports to the facility's management system. Design it around each generator's consumption, the redundancy the facility needs, and the storage requirements of AS 1940 and the project's fire engineering.
A data centre generator plant is only as reliable as the fuel system behind it. The generators get the attention, but in a long outage it is the pumps, valves and controls between the bulk tanks and the engines that keep them running.
This guide explains how bulk storage and day tanks work together, what the transfer system needs, and the decisions that shape it. It sits alongside A-FLO's data centre fuel and power solutions. For sizing the total reserve, see A-FLO's guide to diesel storage for backup generators.
2 levels Bulk storage for the reserve, day tanks at each generator
Duty + standby Transfer pumps arranged so one can fail without stopping supply
600 to 8,000 L The GENCUBE self-bunded generator tank range
Why Data Centres Use Bulk Tanks and Day Tanks
A single large tank feeding every generator directly is simple on paper, but it puts all of the fuel in one place, often some distance from the engines. Splitting storage into two levels solves several problems at once.
Bulk storage
The reserve
Large self-bunded tanks hold the fuel for the required runtime, sited for tanker access and refuelling. A-FLO's Fueltainer range covers the larger volumes.
Day tank
Fuel at the engine
A smaller tank beside each generator keeps fuel close to the engine's supply and return lines, and keeps the generator running for a period even if transfer stops.
Transfer
The link between them
Pumps, pipework, valves, filters and controls that refill each day tank from bulk automatically, without anyone on site.
A-FLO's GENCUBE generator tanks are self-bunded, listed as AS 1940 compliant, and available from 600 to 8,000 litres, with 12V electric or rotary hand pump options. They suit day tank and smaller standby applications.
What the Transfer System Needs
| Component |
What it does |
What to decide |
| Transfer pumps |
Move fuel from bulk to day tank |
Flow rate above the generators' combined consumption, and duty and standby arrangement |
| Level controls |
Start and stop transfer at set day tank levels |
Start, stop, low alarm and high alarm points, and a separate high-high shutdown |
| Overfill protection |
Stops a day tank overflowing if a control fails |
An independent high-level cut-out and an overflow path back to bulk or into containment |
| Filtration |
Removes water and particles before fuel reaches the day tank |
Filter rating, water separation and access for element changes |
| Isolation valves |
Let one tank, pump or filter be serviced while the rest runs |
Where to isolate, and how the system runs with a section isolated |
| Monitoring |
Reports levels, pump status and alarms |
Remote gauging, and an interface to the facility's building management system |
A-FLO's data centre fuel transfer systems can include duty and standby pumps, level controls, filtration, isolation valves and monitoring interfaces, configured to the project.
Redundancy: Planning for a Failure
The transfer system should keep fuel flowing when one part of it fails. The common approaches are:
- Duty and standby pumps. A second pump starts automatically if the first fails or cannot keep up.
- More than one bulk tank. Fuel stays available while one tank is cleaned, repaired or refilled.
- Day tank reserve. Enough fuel in each day tank to keep its generator running while a fault in the transfer system is found and fixed.
- Power for the pumps. Transfer pumps supplied from the generator-backed power system, so they run during the outage they exist for.
- Manual fallback. A way to transfer fuel by hand if automatic control fails, with a procedure the team has practised.
Match redundancy to the facility
How much redundancy the fuel system needs follows the facility's own design and uptime targets. Agree the fuel system's redundancy with the electrical and mechanical design, not after it.
Testing and Maintenance
Generators are tested regularly. The fuel transfer system should be tested with them, not assumed to work.
- Run the transfer cycle. Draw a day tank down far enough that the pump starts and stops on its controls.
- Swap duty and standby. Alternate pumps so both are proven, and test the automatic changeover.
- Test the alarms. Check that high and low level alarms reach the people and systems that need them.
- Change filters on schedule. A blocked filter is one of the simplest ways for transfer to fail.
- Exercise the valves. Isolation valves that are never moved can seize.
A-FLO's service and maintenance team covers diesel storage, fuel transfer equipment, filtration and tank monitoring. For filter ratings, see fuel filtration explained.
Compliance and Siting
Diesel storage at a data centre is addressed by AS 1940, along with the project's fire engineering, environmental requirements and the local authority's approvals. Day tanks inside generator rooms or enclosures, bulk tanks outside, and the pipework between them all need to fit those requirements. A-FLO's data centre solutions consider storage design under AS 1940 and project-specific fire and environmental requirements. Where extra fire protection is specified, A-FLO also supplies fire-rated fuel storage tanks, described on the data centres page.
What Goes Wrong
- One transfer pump. A single failed pump stops every generator once the day tanks run down.
- Pumps not on backed-up power. The outage stops the pumps that should be refilling the day tanks.
- No independent overfill cut-out. A stuck level switch floods a generator room with diesel.
- Alarms nobody receives. Alerts that go to an unmonitored panel are no help at 2 am.
- Untested changeover. The standby pump is discovered faulty when it is needed.
- No access for servicing. Filters and valves that are hard to reach get skipped.
Frequently Asked Questions
What is a generator day tank?
A day tank is a smaller fuel tank beside a generator that supplies the engine directly. It is refilled automatically from bulk storage, and keeps the generator running for a period if transfer from the bulk tank stops.
Why do data centres use day tanks as well as bulk tanks?
Bulk tanks hold the main reserve where tankers can refill them. Day tanks keep fuel close to each engine and provide a local buffer, so a problem in the transfer system does not stop the generators straight away.
How does fuel get from the bulk tank to the day tank?
Transfer pumps move it automatically. Level controls in the day tank start a pump when the level falls to a set point and stop it when the tank is full, with alarms for high and low levels and an independent overfill cut-out.
What is a duty and standby pump arrangement?
Two transfer pumps, where one normally runs and the second starts automatically if the first fails or cannot keep up. Alternating them during testing proves both work.
Can A-FLO supply fuel transfer systems for multiple generators?
Yes. A-FLO can assist with pump and fuel transfer configurations supplying several generator day tanks from central bulk storage. The design depends on the generators, controls, operating strategy and the project's engineering requirements.
How often should a generator fuel transfer system be tested?
Test it alongside the generators' regular test runs, following the facility's maintenance schedule and the equipment manufacturers' guidance. Check the pump start and stop, duty and standby changeover, alarms and filters.
What size day tank does a generator need?
It depends on the generator's fuel consumption, how long it must run without transfer, and the space and fire requirements of the generator room. A-FLO's GENCUBE generator tanks range from 600 to 8,000 litres.