If you are a trade customer but don't have a web account, click here to apply.
The A-FLO Equipment Project Team conducted a thorough initial assessment of the existing oil tanks, pump bay, and workshop layout. Comprehensive maintenance was performed on the multi-compartment oil tanks, including cleaning, repairs, and safety feature upgrades. RAASM high volume oil pumps were strategically installed in the pump bay for maximum efficiency and minimal downtime. Our engineers and technicians designed and installed new oil pipework to ensure a smooth flow from the tank location to the workshop, adhering to safety and quality standards. Additionally, a hose reel gantry was set up for controlled and precise oil dispensing. The entire system underwent rigorous testing and commissioning by the project team to ensure flawless operation.Products & Services Provided: